Installation The ultrahigh
vacuum was installed in October 2004. The following pictures show several steps
during the installation process.
Step 3. Inspect the system Step 4. Move into place Step 5. Install the XPS analyzer. Step 6. Put on custom made suit for baking session Step 7. Perform UHV system bake-out Step 8. Applaude Steps 9 + 10. A peek inside: The sample holder and the mass spectrometer on the left, and the scanning tunneling microscopy stage on the right. |