Installation
The ultrahigh
vacuum was installed in October 2004. The following pictures show several steps
during the installation process.
Steps 1 + 2. Open box and unwrap
Step 3. Inspect the system
Step 4. Move into place
Step 5. Install the XPS analyzer.
Step 6. Put on custom made suit for baking session
Step 7. Perform UHV system bake-out
Step 8. Applaude
Steps 9 + 10. A peek inside: The sample holder and the mass spectrometer on
the left, and the scanning tunneling microscopy stage on the right.
|